Hydro power

Feasibility study

image335

Desk-top evaluation of the hydro potential of rivers in an area. Outline estimates of the scheme size, potential generation, revenue and cost.

Design

image336

Selection of the optimum locations for the infrastructure including intake(s), pipeline(s), access roads, power house and grid connection.

Planning

image337

Consultations with planning authorities, undertaking surveys, impact assessments, mitigation measures and planning applications.

Construction

image338

Appointment of contractors, environmental protection, project management and budget management.

Operation

image339

Maintenance of the infrastructure, monitoring of generation, reporting of power output and financial management

Catchment management

image340

Monitoring of river flows and generation, optimisation of flow regime, restoration of upstream catchment and controlled release of stored water.

Contact Us

MNV Consulting

Stirling Road, Callander UK FK17 8LE

01877 331080 info@mnvconsulting.eu